Compare the hashes of the detection areas after the upgrade to prevent the lines from being overwritten.
· AI Box
If the upgrade is successful but the markings are lost, it is equivalent to making the customer redo the project. Back up before the upgrade and compare after completion.。
Background and objectives
Overwriting the configuration partition is a common incident. Clearly specify the division of responsibilities during the handover: The integrator is responsible for installation and joint commissioning, while the AI box side provides the baseline package and acceptance criteria. Standardize terminology to avoid miscommunication between the parties. At least one set of control samples should be kept for each of the following conditions: night and day, fully loaded and unloaded, dry and slippery. This is to avoid signing off only under ideal conditions. It is recommended that the acceptance materials include four items: reference samples or short videos, current parameters or calibration version numbers, inspector's signature, and date. If one item is missing, this round of acceptance is not considered complete. During on-site verification, record the equipment number, software package number, and the illuminance or vehicle speed/person count at that time.Fluid, and leave no less than eight seconds for the photo section。
Key Points for Implementation
Back up before the upgrade, and automatically compare the detection area with the arming table after completion. Select one of the devices currently in use for upgrade verification. The handover and maintenance list shall include the inspector, date, version number, and sample image/video path. Only after playback and successful matching can the list be signed off and the work concluded. Any change in the hardware batch, driver, ISP/calibration package, or platform configuration on either end requires running a reference sample. Do not enter the customer's site if there is no version with a comparison record. If the conditions change, follow「AIBox Upgrade Configuration Verification」The original path is re-measured, and the new and old results are saved side by side for easy reconciliation in the future.。
Acceptance Recommendations
FailedRevertible。把「AIBox Upgrade Configuration Verification」It is more reliable to write it as a checklist: prerequisites, operating procedures, acceptance criteria, and evidence storage location. After-sales service is carried out according to the checklist, which is less troublesome than repeated verbal training. When it is not possible to complete the task on-site in one go, a 46-minute pilot can be conducted first, for verification only.「AIBox Upgrade Configuration Verification」Related closed loop; after successful pilot, expand to all locations or the entire fleet. Before signing, confirm that the evidence can be opened and that the version numbers match, to avoid leaving only verbal conclusions. The release notes specify configuration compatibility. Perform a comparison before mass production or handover for maintenance: Use the same route and the same scenario file, and view the new and old versions side by side. Stop the release if the deviation exceeds the limit; do not approve it based on a "seems about right" feeling. Failure cases such as false alarms, missed detections, color casts, and signal interruptions should also be archived and handled according to「AIBox Upgrade Configuration Verification」Categorize and attach reproduction clips so that they can be directly used for comparison the next time a project is initiated. Most rework cases don't stem from algorithms suddenly deteriorating overnight, but rather from bracket tolerances, module batches, or configurations being rolled back without anyone taking note. When encountered,「AIBox Upgrade Configuration Verification」For related complaints, first reproduce the issue following the same path, then adjust the parameters. When the same issue occurs again, first retrieve the previous「AIBox Upgrade Configuration Verification」as a reference, and then decide whether to change the parameters。
Need help evaluating programs?
Explain that the platform and the scenario, along with the AI box, can be jointly scheduled for integration and delivery.