Clearly specify multi-channel specifications as 1080P/25fps with concurrent algorithms; otherwise, it will exceed the limit upon installation.

· AI Box

Clearly specify multi-channel specifications as 1080P/25fps with concurrent algorithms; otherwise, it will exceed the limit upon installation.

If you specify 16 channels without mentioning the resolution and frame rate, it will definitely exceed the limits upon installation. The specifications indicate the number of channels and simultaneous algorithms.。

Background and objectives

When the main stream is fully enabled, decoding and inference compete for the same SoC. Failure cases such as false alarms, missed detections, color casts, and stream interruptions should also be archived, and categorized according to「AIBox Multi-Channel Concurrency Specifications」Classify and attach reproduction clips so that they can be directly used for comparison the next time a project is initiated. Sampling inspections can be conducted once every 6 units, with no less than 24% of each batch being sampled. After non-conforming rework, evidence must be re-collected, and the old files must be retained for comparison. Directly overwriting them is prohibited. When performing on-site verification, record the device number, software package number, and the illuminance or vehicle speed/pedestrian flow at the time, and retain a video segment of no less than 8 seconds.。

Key Points for Implementation

The specifications indicate the resolution, frame rate, and number of simultaneous algorithms for each channel; if exceeded, sub-stream analysis is performed. Perform actual streaming acceptance based on the number of channels specified in the specifications. Most rework cases are not due to algorithms suddenly deteriorating overnight, but rather because bracket tolerances, module batches, or configurations were rolled back without anyone taking note. When encountered,「AIBox Multi-Channel Concurrency Specifications」For related complaints, first reproduce the issue along the same route, then adjust the parameters. Perform a comparison before mass production or handover for maintenance: Use the same route and the same scenario file, and view the new and old versions side by side. Stop distribution if the deviation exceeds the limit. Do not approve based on a "seems about right" feeling. If the conditions change, follow「AIBox Multi-Channel Concurrency Specifications」The original path is re-measured, and the new and old results are saved side by side for easy reconciliation in the future.。

Acceptance Recommendations

Demo is forbidden to cross the border.「AIBox Multi-Channel Concurrency Specifications」First, clearly describe the phenomenon: under what lighting/vehicle speed/pedestrian flow conditions it occurs, how long it lasts, and take photos or record short videos on-site for documentation. Verbal agreements in the AI Box project can easily become misaligned after shift changes. The handover and maintenance list should include the inspector, date, version number, and the path to sample images/videos. Only sign off once the content can be played back and verified. Before signing, confirm that the evidence can be opened and that the version numbers match, to avoid leaving only verbal conclusions. The tender parameter table directly cites this specification statement to reduce ambiguity. Changes to any aspect of the hardware batch, drivers, ISP/calibration package, or platform configuration,All must run control samples. Do not enter the customer's site without a version with a reference record. It is recommended that the acceptance materials include four items: the reference sample or short video, the current parameters or calibration version number, the inspector's signature, and the date. If one item is missing, this round of acceptance is not considered complete. When the same issue occurs again, first retrieve the previous「AIBox Multi-Channel Concurrency Specifications」as a reference, and then decide whether to change the parameters。

Need help evaluating programs?

Explain that the platform and the scenario, along with the AI box, can be jointly scheduled for integration and delivery.

← Back to News List